Certification for
Initial operation Subsequent operation
of a REMKO air-conditioning unit / system
Outdoor part Indoor unit 1 Indoor unit 2 Indoor unit 3
Unit type:
Unit number:
Setup location:
Unit data according to type plate
Name:
Street:
Postal code, city:
Set up by:
Test
Visible check setup / assembly of outdoor part and indoor unit(s)
OK problem
Visible check of the heat-exchanger
OK problem
Visible check of the connection lines (switched, damaged, bent?)
OK problem
Visible check of the heat insulation (condensation)
OK problem
Check of the condensation drainage (with water) incl. condensation pump (if applicable)
OK problem
Impermeability check of the connections on the outdoor part and indoor unit(s)
OK problem
Shut-off valves on the outdoor unit open (if applicable)
OK problem
Test run of unit operation
Compressor / fan [ outdoor part and indoor unit(s) ]
OK problem
Power consumption
A
Room temperature / air outlet temperature / air intake temperature
Functional test of remote control
OK problem
Comments:
Result
The following must be performed / measured / validated during initial operation:
°C / °C / °C
The room air conditioning system above was put into operation without any objections.
The operator has been trained and the operating instructions distributed.
The unit could not be put into operation due to the reasons above.
Company:
Street:
Postal code, city:
Executing company:
Date Signature of person assembling / putting unit into operation Operator signature