Certification for
Initial operation Subsequent operation
of a REMKO air-conditioning unit / system
Outdoor part Indoor unit 1 Indoor unit 2 Indoor unit 3
Unit type:
Unit number:
Setup location:
Unit data according to type plate
Name:
Street:
Postal code, city:
Set up by:
Test
Visible check setup / assembly of outdoor part and indoor unit(s)
 OK  problem
Visible check of the heat-exchanger
 OK  problem
Visible check of the connection lines (switched, damaged, bent?)
 OK  problem
Visible check of the heat insulation (condensation)
 OK  problem
Check of the condensation drainage (with water) incl. condensation pump (if applicable)
 OK  problem
Impermeability check of the connections on the outdoor part and indoor unit(s)
 OK  problem
Shut-off valves on the outdoor unit open (if applicable)
 OK  problem
Test run of unit operation
Compressor / fan [ outdoor part and indoor unit(s) ]
 OK  problem
Power consumption
A
Room temperature / air outlet temperature / air intake temperature
Functional test of remote control
 OK  problem
Comments:
Result
The following must be performed / measured / validated during initial operation:
°C / °C / °C
 The room air conditioning system above was put into operation without any objections.
 The operator has been trained and the operating instructions distributed.
 The unit could not be put into operation due to the reasons above.
Company:
Street:
Postal code, city:
Executing company:
Date Signature of person assembling / putting unit into operation Operator signature