
Certification for Initial Operation Date 01/2005
Initial Operation Subsequent Operation of a REMKO air-conditioning system
The room air conditioning system above was put into operation without any objections.
The operator has been trained and the operating instructions distributed.
The unit could not be put into operation for the reasons indicated above.
Company:
Street:
Postal code, city:
Stamp and signature
Executing company:
Date Operator signature
Unit data
Outdoor unit Indoor unit
Type of unit
Unit number
Refrigerant pipe length/height
———– m/ m
Oil elevation arcs
———– units
Additional refrigerant amount
g ———–
Condensation pump
———–
Operator / Setup location Name:
Street: Postal code, Country, City:
Telephone: Fax:
Test of cooling cycle Result
Visual check: Setup of outdoor unit and indoor unit
5 good 4 poor
Heat-exchanger, insulation, pipes
5 good 4 poor
Electrical fuse protection type A
5 good 4 poor
Electrical power/control line Cu (mm² / mm²)
/
5 good 4 poor
Impermeability check: Vacuum mbar
5 good 4 poor
Excess pressure mbar
5 good 4 poor
Add. preparation: Refrigerant refill amount g
5 good 4 poor
Shut-off valves open
5 good 4 poor
Functional check: Condensation flow, condensation pump(s)
5 good 4 poor
Cooling mode
5 good 4 poor
5 good 4 poor
Operational check: Compressor mode
5 good 4 poor
Fan mode
5 good 4 poor
Measurement tests: Room temperature / Air outlet temperature °C / ° C
/
5 good 4 poor
Suction temperature / Overheating °C / K
/
5 good 4 poor
Comments:
Signature of person assembling unit
Comentários a estes Manuais